Our Background
Established in 2018, MPC stands as a prominent construction firm specializing in the renewables and utilities sectors. Our extensive service portfolio caters to clients on a national scale, offering:
​
-
Substation Construction
-
Underground Grid Connections
-
Windfarm Roads and Hardstands
-
Bulk Earthworks
-
Site Clearing
-
Environmental Remediation, Construction, Road and Bridge Works
![WhatsApp Image 2023-11-03 at 14.08_edited.jpg](https://static.wixstatic.com/media/5b2868_801b10e48a5d4561bd7ca325aac62e1f~mv2.jpg/v1/crop/x_0,y_398,w_1200,h_884/fill/w_481,h_354,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/WhatsApp%20Image%202023-11-03%20at%2014_08_edited.jpg)
![dji_fly_20231031_122258_508_1698755042539_photo_optimized.jpg](https://static.wixstatic.com/media/5b2868_25fca20424f7426f9bdb21b1b5490b16~mv2.jpg/v1/fill/w_481,h_354,al_c,q_80,usm_0.66_1.00_0.01,enc_avif,quality_auto/dji_fly_20231031_122258_508_1698755042539_photo_optimized.jpg)
With a dedicated team of over 40 professionals strategically placed across Ireland, we diligently serve the evolving needs of a distinguished clientele, which includes esteemed organizations such as:
​
-
Suir Engineering
-
Jones Engineering
-
Statkraft
-
Mainline Utilities
-
KLM Utilities
-
MEIC
-
Lisheen Mines
-
Ballycumber Windfarm Ltd
-
Siac
​
At MPC, we pride ourselves on delivering exceptional results and exceeding the expectations of our valued clients.
MPC PROJECT TIMELINE
Ballycumber Windfarm 2018
Rossaveal Windfarm 2018
Maghermore Grid Connection 2018/2019
Mauricetown
Grid Connection 2019
Fit out of Battery storage “Shannonbridge A” 100 MW
Kilmathoy
Grid Connection 2019
Dunmanway Grid Connection 2019/2029
-
​Electrical Substation
-
24 KM of HV Gridline
-
Turbine Base
-
3.5 KM HV Gridline
-
8.5 KM HV Gridline
-
3.5 KM HV Gridline
-
100 MW Battery Storage Fitout
-
3.5 KM HV Gridline
-
3.5 KM HV Gridline
Ballymacarney Solar Farm 2020
-
30 KM HV Gridline
-
110 kV Substation and Compound
-
Solar Farm Road Construction
South Meath Solar Farm 2021
-
2 KM HV Gridline
-
110kV Substation and Compound
Moanvane Windfarm 2022/2023
-
110kV Substation and Compound
-
Extension of existing Mount Lucas Compound
Current Projects
-
Shannonbridge B Battery Storage Facility
-
First project with hybrid grid stabilisation technology combined with large-scale battery storage in a single grid connection
-
Clonfad Solar Farm
-
To be the second largest solar farm in Ireland